manly Project
The oasis at home
The Design Brief
This elegant pool features a modern, sleek design that will enhance the outdoor living area and provide a unique haven to relax and entertain family and friends for years to come.
An opulent pool design with a fire pit adds a luxurious feel to this outdoor space, transforming it into a tranquil haven.
Revel in the ultimate relaxation experience as the fire light reflects off the waves of the pool and the family can enjoy the warmth of the flames, providing a memorable and superior leisure experience.
The Process
Mark Out
During this stage, we dive deep into the specifics of the project, taking into consideration every aspect. This is the time when we encourage our clients to ask any relevant questions they may have, and it’s also the perfect opportunity to make any last-minute adjustments to ensure your pool is tailored to your unique needs and desires.
Excavation
Although the duration of this stage varies based on the project’s specific needs, we remain committed to ensuring that every detail is meticulously executed. So, whether it takes one day or multiple days to complete, we remain steadfast in our dedication to delivering a high-quality finished product that exceeds your expectations.
Steel Reinforcement & Internal Plumbing
Once the steel fixers have finished their work, our engineers conduct a thorough inspection to ensure that the structure is not only visually stunning but also structurally sound.
With the steel in place, it’s time for our talented plumbers to take the reins. They skillfully install the internal plumbing that will run throughout the pool’s shell, ensuring that every connection is secure and that the system runs flawlessly.
Concrete
Filtration
Once the concrete has cured, we move on to the installation of your Filtration Equipment, which is carefully located according to your specific design and preferences. Whether it’s positioned behind a feature wall, down the side of your house, or within a dedicated filtration room, we work with you to find the perfect location for this critical component of your pool system.
Coping / Tiling Stage
This is a truly exciting moment in the pool construction process, as the Tiling Stage (CLICK TO EXPLORE) is when you can truly start to see the beauty and elegance of your pool come to life.
Depending on the scope of the tiling works, this stage can take anywhere from two days to two weeks, with our team working diligently to ensure that every tile is placed with care and precision.
Pebble Stage
After allowing the pebble crete to dry overnight, our team returns to acid wash the surface, bringing out the vibrant colors and stunning finish that will transform your pool into a true work of art. This is an exciting moment, as you start to see the vision of your pool fully realised.
Commission
Handover
During the handover, you will receive a detailed explanation of how to operate and maintain your pool’s equipment, including chlorinators, pool cleaners, remote controls, and more. We will walk you through the process step-by-step, answering any questions you may have along the way.
Pool Servicing
That is why with every contract sold we have a complimentary Pool Servicing Contract in conjunction with The The Pool Builders Pool Shop, in which you will receive 12 months of pool servicing complimentary to help you maintain your new pool, and enjoy it for years to come.
Every month for One Year Pool Builders will attend your home and complete a full Pool Service of your pool, inclusive of the following:
- Brush down of pool steps, walls and floors
- Removal of water debris
- Clean of basket contents in the skimmer box and pool pump
- Check for pool staining or defects
- Water chemistry test (water test and chemical balance check)
- Clean out any debris from your robotic cleaner
- Set up pool cleaner cycle and program your weekly timer
- Full equipment check on all filtration, check for any maintenance
- requirements (check seals for leaks)
- Filters backwashed and cartridges cleaned
- Add the required chemicals (this is an extra charge) specified in your unique water chemistry report (emailed directly to your inbox)